
The point’s display name appears at the top of the view (Ro3 in this example).
You access this tab from the Edit Points view. To access the Edit Points view, click , double-click the module row in the table, click the Additional Points tab, click a link to an output point and click the Active Schedule tab.
You manually assign or unassign schedules to the currently displayed point using the learn mode, the assign and unassign buttons.| Column | Description |
|---|---|
| Display Name | Reports the name of the schedule. |
| Usage | Helps to identify the schedule and provide filtering options when choosing a schedule from a list. |
| Status | Reports the current condition of the entity as of the last refresh: {alarm}, {disabled}, {down}, {fault}, {ok}, {stale}, {unackedAlarm} |
| Out Source | Drives the output for the schedule. For example, an Out Source, such as “week:Thursday” means that events follow the weekly schedule for Thursday. If a special event is controlling the schedule, you may see, Special event:Event Name. Event Name is the name given to the special event when it was set up. |
| Out | Identifies the current state of the schedule. |
| Next Time | Identifies the next time the schedule will change. |
| Next Value | Identifies the next state the schedule will change to. |
| To Display Path String | Reports the station path for this point. |