Linking weekly schedules to other components provides scheduling control. You can link a single schedule to many target components.
Prerequisites: You have a configured weekly schedule component and writable target component in a Wire Sheet view.
- In the Wire Sheet, mouse over the weekly schedule’s
Out slot until highlighted.
- Drag the link wire from the weekly schedule to the bottom of the target component and release the mouse button.
The
Wire Sheet opens a
Link Window.
The source (left) side shows the schedule’s Out slot preselected.
- In the target (right) side of the Link window, click the desired slot of the target component.
By convention, if linking to a priority array input of a writable point, In16 is used for schedule level control. However, you can select any available level desired.
- With both source and target sides selected, click OK.
The target point or component is now linked to the weekly schedule.