Often, a weekly schedule is in a different container than the target component. In this case, the easiest way to link is using
the Nav tree.
Prerequisites: You have a configured weekly schedule and writable target component in the station.
Perform the following steps:
- Expand the Nav tree to locate the source weekly schedule, noting its name.
- Right-click the weekly schedule and select
Link Mark.
- Expand the Nav tree to locate the target component.
- Right-click the target component and select
Link From <weeklyscheduleName> from the popup menu.A Link window opens.
- In the source (left) side, click the schedule’s
Out slot.
- In the target (right) side, click the desired slot of the target component.
By convention, if linking to a priority array input of a writable point, In16 is used for schedule level control. However, you can select any available level desired.
- With both source and target sides selected in the Link dialog, click OK.
The target point or component is now linked to the weekly schedule.