Setup prerequisites

Before installation, a certain amount of planning is required. This includes surveying the third-party equipment already in place, determining needed equipment, identifying any additional third-party requirements, and deciding on names and credentials.

Both hardware and software require configuration and preparation. Before installing software, all controllers, modules, enclosures and power supplies should be installed. Devices, such as readers and keypads should be physically installed and connected to the local area network. The following hardware documentation provides information:

  • JACE-8000 Controller (12977) Mounting and Wiring Guide
  • Remote 2 Reader Module (10724) Mounting & Wiring Guide.
  • ENC-001 & ENC-002 Enclosure Install Guide
  • Small (10728) Security Enclosure Install Sheet
  • Direct I/O-16 Module Installation and Configuration Guide
  • Direct I/O-34 Module Installation and Configuration Guide
  • Remote I/O Module (T-IO-16-485) Mounting and Wiring Instructions
  • Remote I/O Module (10723) Mounting & Wiring Guide
Before using the system, make sure that all setup prerequisites are met and that the host platform and system components are configured properly.